Operational

March (Floods Ferry Road) wind turbine

Cambridgeshire turbine helping to supply the nation with spuds.

Loading...

Project summary

Thrive’s March turbine is based on-site at Greenvale AP – the UK’s largest supplier of organic potatoes. By supplying clean electricity to the factory, our wind turbine helps Greenvale manage their energy demand in a more sustainable and cost-effective way – so they can continue providing local jobs and delivering spuds to the nation. They’ve got some great neighbours too – our Boardinghouse and Ransonmoor wind farms are just a stone’s throw away. Thanks to the flat, level land of the Cambridgeshire Fens it’s a great spot for wind resource.

Operational Since

2014

Size

1.5

MW

Technology

Wind

March, Cambridgeshire